decking foundation revision required
digging post holes for the deck and i have hit builders rubble about 350mm down ( 12 of 24 holes, ) . Looks like its a possible old pool filled in so i will have to dig up to 2m down to hard surface or provide new foundation method for the council.
Original plan was for stumps in 600mm hole. Low Deck 250 above ground.
Anyone come across this problem before and what was a fix?
For a new foundation method ( concrete slab?other ) can anyone recommend an engineer to check site and provide enginering design to allow footings to be placed on filled ground. ( eastern suburb Melbourne)
-
30th October 2007, 02:10 PM #2
Have a chat to Phil, P.R. Building Surveying Services. 9803 1400.
Peter.Too many projects, so little time, even less money!Are you a registered member? Why not? click here to register. It's free and only takes 37 seconds!Doing work around the home? Wander over to our sister site, Renovate Forum, for all your renovation queries.
-
30th October 2007, 05:47 PM #3
Yes. One of my first deck contracts about a hundred years ago now, I struck an old concrete septic tank full of rubble. Dug down to the base, knocked a hole in it, and found rock about two metres below ground. I put in a 300mm pier liner, backfilled and poured concrete.
It took me an extra day on the shovel and crow bar and used a bit more crete and a pier liner, but I got a variation from the client because I'd specified standard footing depths. There were no complaints and it wasn't a big deal.
Similar Threads
-
Decking tips required
By Al Kilgour in forum DECKINGReplies: 11Last Post: 4th October 2007, 05:08 PM -
Selang batau decking finish required
By bernstar2 in forum DECKINGReplies: 1Last Post: 16th July 2007, 05:38 PM -
Feedback on decking project
By nmilne in forum FLOORING, DECKING, STUMPS, etc.Replies: 6Last Post: 9th January 2006, 10:44 AM
Bookmarks