Originally Posted by
Ivan in Oz
I've just had my Slab put down.....[Green Dreamed it]....:no::B Sorry; back on track:(
Slab:
It was 100mm - 125mm Thick;
12M x 12 M..........144M^2
MAIN Building:
9M x 12M including the Trenches were Visqueened
Awning:
12M x 3M......No Visqueen
There was a total of 216 metres of Footing which was poured in-situ with the slab.
Trenches were every 3 Metres......because of Highly Reactive clay...here it is either FLOOD or Drought....Grrrrrr!!!
Included were:
F72 Reo
Trench Reo
Chairs etc, etc, etc
also Drainage for Shower, Laundry tubs, Floor Waste and toilet
40mm Conduit for POWER
COST - about $10,000 - $12,000,
I don't know the final Cost,
as They are trying to hit me for Double a few items.
Double GST on the Garage Kit
Double Cost for Extra Gravel and BobCat
Exorbanate charge for the mounting of the Electric Roller Door Motors...10-15 Minute Job,
AND
I have done it myself elsewhere, ALONE
and a couple of other 'EXTRA Costs':no::doh:
No!
Not yet passed over any $$$$,
Will,
but will hold some back:)