One thing i just cant get my head around is how to make a level footing base on a sloping slab. The slab will be 4m wide & a 1 in 10 slope i guess will be a 40mm slope. (for water run off)
Now can a blocklayer start a 2.6m wall on that slope leveling the first block with the mortar ?
In the engineering drawings the base of the wall has a raised bit im assuming is for providing a level base to start the blocks.
Do people do this & if so how ?
Cheers.