Hi,
I have just finished demolishing a house and the site has been cleared of rubble from the surface. I now need to hire an excavator (20Tonne) to rake the site.
Just wondering if there is a recommended size of bucket ie hole size, to grade the site.
What is the max size of old mortar,chipped bricks etc etc that can be left.
A local firm has a bucket that will sift out bits greater than 100mmX100mm.is this the norm or should I be looking for a bucket with a smaller sift size.