I need to raise the flooring bearers by max of 40mm in a few areas. Everything is ready to go. Have removed the flooring, have the jacks ready and ordered new flooring. The concrete stumps have sunk over the years. So what should I use for packing material between the concrete stumps and wooden bearers ?