Originally Posted by
Afro Boy
We had our final inspection before settlement on the weekend. I headed over with the camera and a tape measure. So here's the deal:
The concrete is 120mm from the top of the brick step (internal floor level). I'll be digging out the grass area and putting in some posts so that area's covered.
So what's the structure for a low lying deck? Do the top of the bearers line up with the top of joists? i.e. I use joist hangers attached to the inside of the bearers?
Also, with only 120mm to play with (less thickness of the decking), what options do I have here? Is 100mm bearer/joist height acceptable?
Thanks,
Af.