ok have put my deck /verandah on the back of the house had the old steel framed steps ( runners ?) cut down from 4 steps to 2 and reattached but from the ground up to the 1st step is about 12 inches ( step hieght is about 9 inches ) was going to just do a cement slab so top of cement slab is 9 inches below the steel steps but then that means that there is a 4 inch step to the ground which i would hate to have some one trip over
any sugestions for alternative way of doing this should i slope the edges up or is the 4 inch step a better idea ,leads into garden which slopes away uphill from steps so one end could be made level with the back yard but most people will acess from side as is carport
anyway hope that i have explained this ok thks