Concrete Slab Curing Question
Hi Everyone,
I am looking to have a local building company build a house for me with a concrete slab floor. I have told the company that I would like the slab to cure for 28 days before any construction on the slab. The company has told me that normally they insert mails into a slab (for the timber frame) after 48 hours and I think add the frame soon afterwards, and they follow the MBA standards. They also said that if the slab was left 28 days before construction it could add $1,000 or more to the cost because the nails would need to be drilled.
Can anyone advise if this is correct, and what the standard timeline is for construction after the slab is poured ?
Thanks in advance.