Hare-brained scheme for a hanging beam
I need a hanging beam to support ceiling joists with a 4 metre span. The beam itself has to span 4 metres as well.
I have three 6 metre 90x45 Hyspan joists left over. Looking at the span tables for hanging beams, I would need a 170x45 beam to do what I want.
What I am considering doing is bolting (and perhaps gluing) two of these 90x45s together on edge to form a beam 180x45. Now, I know composite beams can be made up by joining side-by-side but I've never seen them joined on edge like this, possibly for good reason.
So whatchya think?