Wall tiles then mortar bed?
Hi
Well after a few minor setbacks, I'm finally ready for the installation of a mortar bed in the shower/ bathroom. What I'm wondering is....
...is it feasible to tile the walls first, then do the mortar bed and tile the floor?
The reason is that the floor will slope along the wall (the drain is at one end of the shower) and I'd need to cut a few mm off the bottom of the tiles in the bottom row if I do the floor first- this will be very difficult. I thought by putting up the wall tiles first, I can simply build up the mortar to cover the bottom of the tiles.
Brilliant idea or bloody stupid?