Bagged Concrete Mix for Stump Pads ?
Hi All,
Yet another question for you guys.
I am building an extension which needs about 24 stumps. I'm worried that if I get readymix and pour into each hole, it would have set before I have finished placing the stumps
Can I use a bagged concrete mix instead and would it have the same strength as raedymix. I know its a little time consuming though ?
Or am I worrying over nothing and do I order the readymix a little "wet" (dont know the exact terminology)
Thanks
Chris