Damage to Building work (frame stage)
We are finally rebuilding after knocking down our post-war home. I am inspecting the building as much as I can, armed with what I know.
I have some questions in regard to some damaged framing, and damaged ply sub-flooring. So currently at the frame stage - and it feels like its taking forever, and have noticed:
1. There is a large section of a "bottom plate" (if thats what it is called) framing timber that appears to be gouged out exposing untreated timber
2. On advice we chose to install ply subflooring on the top level - instead of the chipboard. in one section it has been damaged (see pic), perhaps by a temporary brace or something
I have asked the builder if these things should be repaired / replaced (no reply yet).
What do you think? Just wondering if anyone has a comment or suggestion, or tell me if I am over reacting....