Joining load bearing beams
I am wanting to get peoples ideas here....still in a high level planning phase.
One idea SHMBO has is to remove two internal load bearing walls that join at 90 degrees to each other. I can understand the princple of placing appropriatly sized beam for one of the walls, but I cannot get it clear in my head how the second beam would attach.
would I install one appropriately engineered beam in then install the second beam mid section to the first higher into the roof space?
The spans are reasonably sized, one being 6 metres and the other 4 metres.