I've noticed a slight dip in my floor and after a quick peak under the house have discovered a gap of about 60mm between a pier in the approximate area and the floor joist.
I've never touched anything like this before so advice on fixing it up very welcome. I'm sure I saw somewhere a guys jack up the floor far enough to get additional bricks in, is this a good / bad idea? I have a Blue Gum floor above and I don't want to damage it.
HH.