Reno RSS Feed
1st July 2009, 06:20 PM
I'm going to lay 130 x 19 spotted gum floor over an existing chipboard floor.
Should i have a vapor barrier between the sub floor and the finish floor? I have read that it is necessary to help control dust and moisture from below as well as dampen squeaks.
I was just going to use a non water based glue and top nail the boards straight onto the chipboard.
Can anyone tell me if i can get a nails to suit a paslode framing gun that would be good for the job.
Read the full thread at RenovateForum.com... (http://www.renovateforum.com/showthread.php?t=76744&goto=newpost)
Should i have a vapor barrier between the sub floor and the finish floor? I have read that it is necessary to help control dust and moisture from below as well as dampen squeaks.
I was just going to use a non water based glue and top nail the boards straight onto the chipboard.
Can anyone tell me if i can get a nails to suit a paslode framing gun that would be good for the job.
Read the full thread at RenovateForum.com... (http://www.renovateforum.com/showthread.php?t=76744&goto=newpost)