Reno RSS Feed
1st May 2009, 04:40 AM
My question is for a 1.5kpa floor load (normal house), I have a floor joist cantileving 200mm at each end of the building 3 Pilles in a row one floor Joist over line of bearer.
Pile set in from building Line by 200mm at each end of building and then bearer canterleved the 200mm same as the joist.
Is the Joist span from pile to pile or is it the total length of joist?
Is the cantilevered section of joist taken into the span?
Can try and draw up what Im trying to say if its hard to understand!
:2tsup:
Read the full thread at RenovateForum.com... (http://www.renovateforum.com/showthread.php?t=76074&goto=newpost)
Pile set in from building Line by 200mm at each end of building and then bearer canterleved the 200mm same as the joist.
Is the Joist span from pile to pile or is it the total length of joist?
Is the cantilevered section of joist taken into the span?
Can try and draw up what Im trying to say if its hard to understand!
:2tsup:
Read the full thread at RenovateForum.com... (http://www.renovateforum.com/showthread.php?t=76074&goto=newpost)