Reno RSS Feed
12th April 2009, 03:30 PM
Hi all! I've been talking to a few blokes, even some that have recently completed their capstone, and not one of them are 100% on cable selection in regard to maximum demand, derating, vdrop, fault loop.
When you guys select the materials for a complete situation, what are your methods?
Here's an example:
6kA (Authority)---50m underground----MSB----30m underground----Submain
Load to be connected to submain
10 DGPO's
12 x 36W Fluoro's
2 x 1000w outside lights
2400W HWS
3.3kw 3 ph lathe
Read the full thread at RenovateForum.com... (http://www.renovateforum.com/showthread.php?t=75874&goto=newpost)
When you guys select the materials for a complete situation, what are your methods?
Here's an example:
6kA (Authority)---50m underground----MSB----30m underground----Submain
Load to be connected to submain
10 DGPO's
12 x 36W Fluoro's
2 x 1000w outside lights
2400W HWS
3.3kw 3 ph lathe
Read the full thread at RenovateForum.com... (http://www.renovateforum.com/showthread.php?t=75874&goto=newpost)