Have just had a slab done for a shed and it's been put on the boundrys. So basically there is about 200mm between the shed and the fence.

What i'm wanting to know is what would be best to put in this area to stop the grass growing. Because once the shed is up there is no way to get into this area.

Any advice would be good.

Thanks

Claw Hama
4th May 2008, 12:08 PM
Concrete strip?

Terrian
10th May 2008, 09:09 AM
100mm thick layer of scoria or screenings (not crushed rock, you don't want fines) or 50mm layer of concrete :)

China
10th May 2008, 11:04 PM
If it is on the boundry why is there a 200mm space

Burnsy
10th May 2008, 11:15 PM
I would speak to the neighbours and see if they are willing to use the shed wall as a fence for the length of the shed and then just have your fence take off each end of it. 200mm is a pain, just large enough for animals to crawl into and die because they can't get out.

Metung
11th May 2008, 11:56 AM
I'm no lawyer but I have a suspicion that if you were to allow the neighbours to use that piece of land and adjust the fence line accordingly then, after a period of time (7-10 years or something), the neighbours can claim title to the land.

Terrian
11th May 2008, 02:59 PM
If it is on the boundry why is there a 200mm space

gutter overhang ? (though that would be 100mm rather than 200mm)

Com_VC
11th May 2008, 04:15 PM
yeah gutter overhang. It's probably more like 150mm.

I'm thinking of doing a strip of concrete, probably the easiest way.

Now how much bags of cement will I need, I presume I'll need sand as well. What about crushed rock or steel?

The area i'll need to cover will be about 12 metres at 150mm wide and 50mm thick.

Ivan in Oz
11th May 2008, 07:39 PM
Roundup ................. Monthly

Terrian
12th May 2008, 09:31 PM
yeah gutter overhang. It's probably more like 150mm.
:-)


I'm thinking of doing a strip of concrete, probably the easiest way.

well, the longest lasting, I would not say easiest (damn, I will have to post pics of the concrete retaining wall & spoon drain the missus & I did a few months back!)


Now how much bags of cement will I need, I presume I'll need sand as well. What about crushed rock or steel?

Lets not go overboard, you would need 2 lengths of trench mesh and then cut about 50mm off the width of them, at about $25 per length, I doubt you are going to do anything on this strip, so I wouldn't bother with mesh.

OK, at about 3 inches thick, you are going to need to make up about .2m3 of concrete. 1m3 of concrete takes .75m3 of stone (14mm screenings) .65m3 of concrete sand & 12 20kg bags of cement, you work it out :-)

have fun....


(.15 of stone, .13 of sand 2.5 bags of cement, standard 6x4 trailer holds 500kg & .5m3 of product)




The area i'll need to cover will be about 12 metres at 150mm wide and 50mm thick.[/quote]

Terrian
12th May 2008, 09:32 PM
Roundup ................. Monthly

that will get expensive after a few decades :-)