Hi,
This is my first go at renovating a bathroom, and I am getting a little stuck on the order of how to do the work.
I have stripped the entire bathroom, and the plumbing will be finished on the weekend. I am just after some help with the shower. I have bought a shower base and screen, and am not sure how to install it so that the villaboard sits on top of the base.
I have the waterproofing product 'Liquid Flash' and was wondering whether I should put this down before or after I grade the fall to waste on the floor.
I have decided to grade the floor with sand/cement and let it set and then use tile adhesive afterwards. Is this a good idea, or is there a better way?
I am very keen to get stuck into it but am just a little hesitent on where to start.
Thanks,
Rob.
This is my first go at renovating a bathroom, and I am getting a little stuck on the order of how to do the work.
I have stripped the entire bathroom, and the plumbing will be finished on the weekend. I am just after some help with the shower. I have bought a shower base and screen, and am not sure how to install it so that the villaboard sits on top of the base.
I have the waterproofing product 'Liquid Flash' and was wondering whether I should put this down before or after I grade the fall to waste on the floor.
I have decided to grade the floor with sand/cement and let it set and then use tile adhesive afterwards. Is this a good idea, or is there a better way?
I am very keen to get stuck into it but am just a little hesitent on where to start.
Thanks,
Rob.