SkyHook
6th April 2008, 08:23 AM
Following on from my last thread "tiling over brickwork" : After such great advice from members of this forum, I am considering getting the wall rendered, then tiling.
(the wall is above the join where the new slab meets the existing brick wall. I imagine that a dark, damp, little 19mm cavity between villaboard and the brick wall - with damp little pine batons - would be a very appealing walkway for termites to crawl up to my roof space)
Can anyone help with info re: how long I need to leave the render before getting it waterproofed and tiled?
Cheers
Mark
(the wall is above the join where the new slab meets the existing brick wall. I imagine that a dark, damp, little 19mm cavity between villaboard and the brick wall - with damp little pine batons - would be a very appealing walkway for termites to crawl up to my roof space)
Can anyone help with info re: how long I need to leave the render before getting it waterproofed and tiled?
Cheers
Mark