Ashes
9th February 2008, 02:27 PM
Had a quick look but couldnt find info on this.
I'll be getting a 10.8x6m slab put in for my shed. What do I need to do to set it up to run electrical, water and waste water away?
Will I need to have the electrical cable trench, water and sewer trenches dug prior to the slab being formed up and a small run of pipe/conduit in place or can I dig the trenches later? Is it easier to get the plumbing and electics done prior to putting in the slab?
I'll be getting a 10.8x6m slab put in for my shed. What do I need to do to set it up to run electrical, water and waste water away?
Will I need to have the electrical cable trench, water and sewer trenches dug prior to the slab being formed up and a small run of pipe/conduit in place or can I dig the trenches later? Is it easier to get the plumbing and electics done prior to putting in the slab?