Hi All,
I am about ready to plonk a 2500 ltr rainwater tank onto a sand base,I have left roughly 50 mm or so from the top of the sand to the top of the retaining wall( sleepers)my intention is to fill this up with those small white stones once the tank is in place.
Can I take take the stones right up to the side of the tank allowing its 50mm depth of stones or would the stones over a period of time tend to indent the tank and possibly cause problems later.
There will be zero traffic around the tank.
Thank you
Cart
I am about ready to plonk a 2500 ltr rainwater tank onto a sand base,I have left roughly 50 mm or so from the top of the sand to the top of the retaining wall( sleepers)my intention is to fill this up with those small white stones once the tank is in place.
Can I take take the stones right up to the side of the tank allowing its 50mm depth of stones or would the stones over a period of time tend to indent the tank and possibly cause problems later.
There will be zero traffic around the tank.
Thank you
Cart