KeepMyDayJob
29th November 2007, 05:53 PM
Hi all,
Grappling wiht flooring dilema. Looking to do Kitchen/Meals/Hall ~40 sqm.
We were thinking of laminate floors (8mm stuff) but have been talked out of it. Want to spend a "little" extra and get real timber (at least on top)
So do we:
1- Floating or glue down?
2 -Engineered timber or solid timber ?
Benefits/disadvantages??
Sub floor is:
- old floor boards (kitchen)
- concrete slab (meals), Needs prep - above boards (3-7mm), not level
- old boards (hall)
Trying to do it for under $100/sqm or abouts.
The prep may be extra. I have done some floor prep before and would be willing to pay someone to do this, but who do you call??
Cheers
Paul (still in need of a new day job - but could just keep on reno-ing)
Grappling wiht flooring dilema. Looking to do Kitchen/Meals/Hall ~40 sqm.
We were thinking of laminate floors (8mm stuff) but have been talked out of it. Want to spend a "little" extra and get real timber (at least on top)
So do we:
1- Floating or glue down?
2 -Engineered timber or solid timber ?
Benefits/disadvantages??
Sub floor is:
- old floor boards (kitchen)
- concrete slab (meals), Needs prep - above boards (3-7mm), not level
- old boards (hall)
Trying to do it for under $100/sqm or abouts.
The prep may be extra. I have done some floor prep before and would be willing to pay someone to do this, but who do you call??
Cheers
Paul (still in need of a new day job - but could just keep on reno-ing)