8th May 2007, 10:26 PM
Hi,
Can anyone offer any advice on how to do stepped footings? We have our trenches dug to the right depth and are gonna construct some formwork where necessary. But our conundrum is how to stop the concrete from just flowing downhill and therefore overflowing at the lowest point. do we need to order thick mix. By the time we reach the top we have risen by 3 mteres..
or do we have to pour the individual steps separately? and wait for them to go off?
Cheers
Can anyone offer any advice on how to do stepped footings? We have our trenches dug to the right depth and are gonna construct some formwork where necessary. But our conundrum is how to stop the concrete from just flowing downhill and therefore overflowing at the lowest point. do we need to order thick mix. By the time we reach the top we have risen by 3 mteres..