Some help please dear forum members, i have read lot's including the JH fixing guide for CTU. It has left me with a couple of questions though.
The CTU will be laid over existing T&G flooring, the areas being tiled are the entrance, hall and kitchen about 30 SqM.
I've had conflicting advice on how to fix this to the existing floor.
Questions.
1. Should I glue and nail, or is nailing sufficient by itself.
2. Nails - can i use a nail gun, if so what do i need to buy. already have quite few air tools one more would be nice :) I'm not looking forward to 2000 odd nails by hand.
3. Where can i buy the gun nails from in the ACT if the answer to 2 is yes.
4. Glue - each of the building supply companies i spoke to gave conflicting advice, JH say to use Stud Adhesive, is this correct? The only stud adhesive i know is the gyprock stuff that is very thick. The fixing guide talks of spreading it on the back of the sheets first.
There is probably a dozen other question that haven't occured to me
Cheers and Thanks in Advance.
Phil
The CTU will be laid over existing T&G flooring, the areas being tiled are the entrance, hall and kitchen about 30 SqM.
I've had conflicting advice on how to fix this to the existing floor.
Questions.
1. Should I glue and nail, or is nailing sufficient by itself.
2. Nails - can i use a nail gun, if so what do i need to buy. already have quite few air tools one more would be nice :) I'm not looking forward to 2000 odd nails by hand.
3. Where can i buy the gun nails from in the ACT if the answer to 2 is yes.
4. Glue - each of the building supply companies i spoke to gave conflicting advice, JH say to use Stud Adhesive, is this correct? The only stud adhesive i know is the gyprock stuff that is very thick. The fixing guide talks of spreading it on the back of the sheets first.
There is probably a dozen other question that haven't occured to me
Cheers and Thanks in Advance.