Decker
24th April 2007, 01:11 AM
Hi i am planning a deck around a new pool (above ground).
The deck will be 9M * 2m AND 1.4 high - See attached design
I am planning to use:
Posts = 100*100 HW
1500 centers
Bearers = 125*50 HW
Joists = 125*50 HW
Deck = Merbeu 90*19
Issue:
I intend to use Gal Post Anchor (Stirups) - due to Brisbane Termites
How deep do i need to have the footings?
How deep into the footing do the Anchors have to go?
I have an issue that 5 of the post loctaions are over storm water (ONLY 300 DEEP) If i move them then one way I am over sewerage (ONLY 600 DEEP), and cannot move them the other due to the edge of the pool.
What are my options ?
Thx
The deck will be 9M * 2m AND 1.4 high - See attached design
I am planning to use:
Posts = 100*100 HW
1500 centers
Bearers = 125*50 HW
Joists = 125*50 HW
Deck = Merbeu 90*19
Issue:
I intend to use Gal Post Anchor (Stirups) - due to Brisbane Termites
How deep do i need to have the footings?
How deep into the footing do the Anchors have to go?
I have an issue that 5 of the post loctaions are over storm water (ONLY 300 DEEP) If i move them then one way I am over sewerage (ONLY 600 DEEP), and cannot move them the other due to the edge of the pool.
What are my options ?
Thx