Am building an extension that includes a laundry and an ensuite and was wondering what you would recommend to use for the base flooring. When I renovated the main bathroom basically the only thing I left was the T&G which I then put 6mm Tile underlay over before putting down tiles. For the two new areas I hadn’t planned to use my good Ironbark T&G as a base before doing the same but was going to use some 12mm Particle board and then put the 6mm Tile underlay over that to bring the floors level before putting tiles on top however as I now have spare (albeit a lot of rubbish which doesn’t matter) T&G I thought I would ask your opinions. Do I :-
<O:p
1.) Use spare T&G (19mm) as base flooring with the 6mm tile underlay over that (as per the main bathroom).<O:p</O:p
2.) Go with the 12mm particle board option with 6mm tile underlay over that?<O:p</O:p
3.) Use solid 18mm compressed sheeting <O:p</O:p
<O:p</O:p
Are all the options as good as one another (so should I just look at cost)? Or is there a preferred method I should adhere to? Thanks in advance folks and I look forward to seeing what you think J<O:p</O:p
<O:p</O:p
Am building an extension that includes a laundry and an ensuite and was wondering what you would recommend to use for the base flooring. When I renovated the main bathroom basically the only thing I left was the T&G which I then put 6mm Tile underlay over before putting down tiles. For the two new areas I hadn’t planned to use my good Ironbark T&G as a base before doing the same but was going to use some 12mm Particle board and then put the 6mm Tile underlay over that to bring the floors level before putting tiles on top however as I now have spare (albeit a lot of rubbish which doesn’t matter) T&G I thought I would ask your opinions. Do I :-
<O:p
1.) Use spare T&G (19mm) as base flooring with the 6mm tile underlay over that (as per the main bathroom).<O:p</O:p
2.) Go with the 12mm particle board option with 6mm tile underlay over that?<O:p</O:p
3.) Use solid 18mm compressed sheeting <O:p</O:p
<O:p</O:p
Are all the options as good as one another (so should I just look at cost)? Or is there a preferred method I should adhere to? Thanks in advance folks and I look forward to seeing what you think J<O:p</O:p