Hi all,
the slab we are putting down will be 13m X 7m with a 100mm step-up at the 8m/5m mark. We are insulating it and pouring in one go as it will be coloured. The problem we have is we do not want to pierce vapour barrier or insulation for formwork support. Is there a way to form up over a 7m expanse for step that doesn't need staking?
TIA,
Peter
the slab we are putting down will be 13m X 7m with a 100mm step-up at the 8m/5m mark. We are insulating it and pouring in one go as it will be coloured. The problem we have is we do not want to pierce vapour barrier or insulation for formwork support. Is there a way to form up over a 7m expanse for step that doesn't need staking?