i would just like to know how long each of these steps will take on average for building a new house

Slab on Ground
-Site Set out
-Excavation
-Form Work
-Vapour Barrier
-Bar Chairs
-Pooring Concrete

Wood Butcher
4th April 2006, 05:38 PM
Turbo,
you could have all of that done in a few days if all went well.

Try getting a hold of the book "Australian Owner Builder" by Alan Staines.
It has all of this sort of info in there.

elphingirl
4th April 2006, 10:31 PM
you could have all of that done in a few days if all went well.


When you've done your assessment - double everything (that goes for budget too!)
Cheers
Justine

ian
4th April 2006, 10:57 PM
hi guys
i would just like to know how long each of these steps will take on average for building a new house Slab on Ground
-Site Set out allow one day
-Excavation depends,
how big an excavator are you going to use?
How many trucks?
how far have you got to cart the excavated material?
little excavator, small truck = many trips to the dump/tip plus lots of time working through any hard stuff
big excavator, 2 or 3 big trucks = not long at all. A friend got ALL his excavation (about 1200 cu.m) done one Saturday morning using a largish Kato and two 14 tonne tippers and a very short haul
who is going to supervise the excavator operator, you?
-Form Work }
-Vapour Barrier } these all depend on the number of bodies used
-Bar Chairs }
-Pooring Concrete allow one day

boban
4th April 2006, 10:57 PM
A professional team of 2 concretors will knock over most house slabs in less than a week.