Hi all,
We have a concrete patio connected to the back of the house that is 12m x 3m. We have a requirement to remove half of this slab along the long axis. What we plan to do is measure 1.5m in from the outside edge and get a concrete cutter to cut the 12m and then break it up (we believe it's only 100mm thick).
After reading here about people cutting concrete and exposing the reo, how do we then treat/finish the cut edge (which will now be the new outside edge of the patio) to protect the reo?
+----------------------------------------------+
| x x x x x x x x x x x x x x x x x x x x x x x x x x x|
|- - - - - - - - - - - - - - - - - - - - - - - - - - - | <= cut
| x x x x x x x x x x x x x x x x x x x x x x x x x x x|
+----------------------------------------------+
| ::::::::::::::::::::: House ::::::::::::::::::::::: |
Thanks in advance.
Geoff
We have a concrete patio connected to the back of the house that is 12m x 3m. We have a requirement to remove half of this slab along the long axis. What we plan to do is measure 1.5m in from the outside edge and get a concrete cutter to cut the 12m and then break it up (we believe it's only 100mm thick).
After reading here about people cutting concrete and exposing the reo, how do we then treat/finish the cut edge (which will now be the new outside edge of the patio) to protect the reo?
+----------------------------------------------+
| x x x x x x x x x x x x x x x x x x x x x x x x x x x|
|- - - - - - - - - - - - - - - - - - - - - - - - - - - | <= cut
| x x x x x x x x x x x x x x x x x x x x x x x x x x x|
+----------------------------------------------+
| ::::::::::::::::::::: House ::::::::::::::::::::::: |
Thanks in advance.
Geoff