Fumbler
10th October 2013, 02:58 AM
Need Help. I have a brand new 1 week old Merbau deck, under cover (99.9% finished). i have heard several different opinions on what to do next, ie oil straight away, weather for 6-8weeks (hosing down every 2-3 days or basically hosing down after its dry eachtime) then deck wash then oil, and even so far as to using napisan to speed up the process. Now i have this beaut deck, i want to do the best thing, which is what?
The section in pics is the first 2/3 of the entire deck, but due to time constraints, will get the last third down after xmas. not too bad a job for a first time decker/weekend warrior. Deck boards are down with CAMO hidden fasteners (great system). I went the pre-drilled option to prevent splitting and i'm glad i did.
thanks, Fumbler
288775288776288777
The section in pics is the first 2/3 of the entire deck, but due to time constraints, will get the last third down after xmas. not too bad a job for a first time decker/weekend warrior. Deck boards are down with CAMO hidden fasteners (great system). I went the pre-drilled option to prevent splitting and i'm glad i did.
thanks, Fumbler
288775288776288777